Castle Rock Adventist Hospital
Health Campus
The first hospital serving the Castle Rock area, this facility operates around the clock for area residents.
Location:
Castle Rock, Colorado
Owner:
Castle Rock Adventist Hospital
Architect:
HuntonBrady Architects
220,000
Total Square Feet
Signature Campus Design & Service
The Big Picture
The first hospital serving the Castle Rock area, this facility includes an Emergency and Imaging Center that operates 24 hours a day, 365 days per year and with 11 rooms including three safe rooms for high-risk patients, and a resuscitation and triage area.
Ingenuity in Action
Working with the design team and local planning and building authorities during the schematic design phase, our team devised a phased procurement schedule to accelerate site and building construction completion.
- Substantial completion was achieved four days ahead of schedule and three months ahead of the client's original schedule.
![CRAHC 2A Exterior - East Elevation from Limelight Ave at night](https://mlmur1damzr5.i.optimole.com/w:688/h:491/q:mauto/rt:fill/g:ce/f:best/ig:avif/https://gejohnson.com/wp-content/uploads/CRAHC-2A-Exterior-East-Elevation-from-Limelight-Ave-at-night-1.jpg)
![CRAHC 2A Level 3 South - Typical LDRP](https://mlmur1damzr5.i.optimole.com/w:688/h:491/q:mauto/rt:fill/g:ce/f:best/ig:avif/https://gejohnson.com/wp-content/uploads/CRAHC-2A-Level-3-South-Typical-LDRP-1.jpg)
![CRAHC 2A LobbyAtrium SW Corner Looking North](https://mlmur1damzr5.i.optimole.com/w:688/h:491/q:eco/f:best/ig:avif/https://gejohnson.com/wp-content/uploads/CRAHC-2A-LobbyAtrium-SW-Corner-Looking-North-1.jpg)
Months for construction of phase one
10
Months for construction of phase 2
19
The little details
- State-of-the-art energy conservation measures include LED lighting throughout, high efficiency mechanical equipment, a super-insulating exterior envelope and roof systems, and the ability to incorporate on-site renewable energy in the future.
- Incorporating a contemporary mountain theme, GE Johnson assisted the design architect with material selection that met these aesthetic requirements while also meeting the long-term lifespan and low maintenance cost goals of the facilities team.