University of Colorado Boulder

Village Center - Dining and
Community Commons

This facility features multiple restaurants, indoor and outdoor gathering spaces, and many other resident life, housing, and dining services.

Location:
Boulder, Colorado
Owner:
University of Colorado Boulder
Architect:
KSQ Architects + Bakersgroup

100,000

Total Square Feet

Gateway to an historic campus

The Big Picture

In a response to student feedback and a desire to replace the outdated Darley Commons, the original building was demolished in 2015 and GE Johnson began construction on this highly visible new facility. The Village Center serves as the gateway to the CU Boulder campus, providing 100,000+ square feet of space where students can enjoy a variety of restaurants, as well as study and social spaces. During months when classes are not in session, the facility is also used to house visiting conference attendees.

Ingenuity in Action

Throughout the lifetime of the project, the team sought out and implemented a number of innovative solutions which drove value into the project and benefited the University of Colorado. One such example is the use of precast concrete, rather than cast-in-place concrete in places. The project required a utility service tunnel under the first floor to connect to an existing tunnel outside the building; originally the design called for this portion of the work to be completed as a cast-in-place concrete tunnel. Recognizing the potential cost and schedule advantages of an alternate method, our Design-Build team recommended building the tunnel out of precast culvert sections to save time on installation of the tunnel and allowing for backfill to commence sooner. Coordination had to happen earlier in the design process to meet the procurement requirements of the precast, but overall saved approximately 4 weeks on construction of the tunnel, thereby delivering immediate tangible value to the University.

Feet away from student dormitories
50
Feet away from student dormitories
50
Percent energy savings
47
The little details
"The design-build team and process played a very important role in the success of this project. Specifically the expertise and ability to come together and work as a team on this project was instrumental in meeting and exceeding the goals and expectations as well as the reality of the schedule and budget constraints."
Jon C. Keiser, Architect
Project Manager
Housing and Dining Services